97% of them were marked resolved. Drivers are still replacing suspensions.
Toronto's own open data shows 93 road surface complaints about Unwin Avenue since 2011, and 97% of them are marked completed or closed. Drivers on that road are replacing their suspensions. Both things are true, and the gap between them is the whole problem.