Sidewalk blocked by construction
Silent. No response from Toronto 311 in 107 days.
Your report was delivered on May 12. Most reports get a response within days; this one has passed that window. This page keeps checking, and keeps count.
Shaw Street Toronto
What's nearby
Pope Francis Catholic Elementary School
School
Ossington Old Orchard Jr Public School
School
Ossington Ave at Churchill Ave
Bus Stop
College St at Crawford St
Bus Stop
Fred Hamilton Playground
Park
The case we sent
Report details · AI-written, reviewed by the reporter
Active construction staging for OTTO'S MASONRY occupies the full width of the sidewalk on Shaw Street, forcing pedestrians into the street to pass; the blockage includes two workers, sandbags, a wheelbarrow, and tools without adequate protective barriers or detour signage.
Description · in the reporter's words
Blocked sidewalk with construction material
What we did for you
- ✓ We heard you, and saw what you saw 3:21:49
- ✓ Made sure no faces or licence plates travel with your photo 3:21:49
- ✓ Wrote the formal report in the city's own language, for you 3:21:49
- ✓ Matched your report to Ward 11, for you 3:21:49
- ✓ Delivered it to Toronto 311, the same minute 3:22:03
- ✓ And when the city says fixed, we check the record and bring the answer back here ongoing
Your 15-second report became all of this before 3:23 the same afternoon.
The neighbourhood
Seen it? Tell your neighbours · your update holds the city to its word
Sign in to report what you see on the ground.
Your ward
More from this area
Animal Issue at Montrose Avenue
Montrose Avenue
27d ago
Abandoned bicycle on sidewalk
1087 Dundas Street West, Toronto
4mo ago
Abandoned bike-share bicycle
1102 Dundas Street West, Toronto
4mo ago
Building facade covered in graffiti tags
1036 Dundas Street West, Toronto
4mo ago
Deep pothole in residential alley
Alan Borovoy Lane, Toronto
5mo ago
Abandoned bicycle on sidewalk
1215 Dundas Street West, Toronto
4mo ago
Discussion · 0 comments
No comments yet. Log in to be the first.