Construction Site Obstruction at Intersection
Silent. No response from Toronto 311 in 150 days.
Your report was delivered on Mar 30. Most reports get a response within days; this one has passed that window. This page keeps checking, and keeps count.
20 Shuter Street, Toronto Toronto
What's nearby
Trinity Square
Park
St Michael's Choir School - Gymnasium Bldg
School
Yonge St at Shuter St
Bus Stop
The case we sent
Report details · AI-written, reviewed by the reporter
No active construction for at least 2 weeks. Cones and signs need to be picked up. Tons of them left behind on sidewalk south side of shutter between Yonge and Victoria in front of Massey Hall.
What we did for you
- ✓ We heard you, and saw what you saw 6:09:02
- ✓ Made sure no faces or licence plates travel with your photo 6:09:02
- ✓ Wrote the formal report in the city's own language, for you 6:09:02
- ✓ Matched your report to Ward 13, for you 6:09:02
- ✓ Delivered it to Toronto 311, the same minute 6:09:25
- ✓ And when the city says fixed, we check the record and bring the answer back here ongoing
Your 15-second report became all of this before 6:10 the same evening.
The neighbourhood
Seen it? Tell your neighbours · your update holds the city to its word
Sign in to report what you see on the ground.
Your ward
More from this area
Standing water on sidewalk
200 Victoria Street, Toronto
3mo ago
Standing water blocks storm drainage
208 Victoria Street, Toronto
5mo ago
Sidewalk blockage construction site
225 Yonge Street, Toronto
3mo ago
Illegal dumping on Yonge Street
225 Yonge Street, Toronto
3mo ago
Person in distress on sidewalk
Church street and Shuter street
1mo ago
Police vehicles blocking bike lanes
Shuter Street
4mo ago
Discussion · 1 comment
No active construction for at least 2 weeks. Cones and signs need to be picked up. Tons of them left behind on sidewalk south sid of shuter between Yonge and Victoria in front of Massey Hall.