Road Damage in Ward 15 — Don Valley West
8 road damage reported in Ward 15. 6 resolved (75.0%). Avg resolution: 9.8 days.
8
Total Reports
1
Open
6
Resolved
75.0%
Resolution Rate
Recent Reports
Extensive asphalt failure and cracking
Resolved
May 06, 2026
Extensive road surface cracking
Many holes
Resolved
Apr 25, 2026
Faded crosswalk markings at intersection
Acknowledged
Apr 21, 2026
Severe road cracking and deterioration
Resolved
Apr 17, 2026
Road surface cracks and deterioration
Resolved
Apr 17, 2026
Road surface deterioration Eglinton
Resolved
Apr 17, 2026
Cracked road surface at intersection
Resolved
Apr 09, 2026
Highway left edge dent hazard
There is a huge dent on the left edge of the road.
Sent
Mar 24, 2026
Spot a road damage in Ward 15?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now