Road Damage in Ward 2 — Etobicoke Centre
22 road damage reported in Ward 2. 13 resolved (59.1%). Avg resolution: 11.3 days.
22
Total Reports
9
Open
13
Resolved
59.1%
Resolution Rate
Recent Reports
Road Damage at Sabrina Drive
Resolved
Jul 29, 2026
Road Damage at 120
Resolved
Jul 29, 2026
Parking lot surface heavily damaged
Hard to see on the attached picture...but the parking lot is full of small depressions ... Its te...
Sent
May 20, 2026
Cracked, spalling sidewalk
Sent
May 08, 2026
Sidewalk cracks and trip hazard
Resolved
May 08, 2026
Extensive road surface damage and settling
Resolved
May 08, 2026
Severe asphalt cracking and spalling
Resolved
May 08, 2026
Multiple potholes in residential street
Resolved
May 08, 2026
Long driveway crack pattern
Resolved
May 08, 2026
Road surface alligator cracking near curb
Resolved
May 08, 2026
Severe asphalt cracking on street
Sent
May 08, 2026
Deteriorated pedestrian crosswalk markings
Sent
May 08, 2026
Spot a road damage in Ward 2?
Report it in 10 seconds. AI writes the report, city gets notified.
Report NowOther Issues in Etobicoke Centre
Road Damage in Other Wards
Ward 1 — Etobicoke North
Ward 3 — Ward 3
Ward 4 — Parkdale-High Park
Ward 6 — York Centre
Ward 8 — Eglinton-Lawrence
Ward 10 — Spadina-Fort York
Ward 11 — University-Rosedale
Ward 12 — Toronto-St. Paul's
Ward 13 — Toronto Centre
Ward 14 — Toronto-Danforth
Ward 15 — Don Valley West
Ward 16 — Don Valley East
Ward 17 — Don Valley North