Long driveway crack pattern
Damage like this spreads with every freeze and thaw, steps from Transfiguration Of Our Lord Catholic Elementary School.
Fixed, confirmed by Toronto 311.
18 days after you reported it. We take the city at its word, and you get the final one: is it actually fixed?
The city marked this resolved May 26, 12:00 AM
Sign in to tell your neighbours what you see on the ground.
Closed, on the record
Fixed in 18 days.
3 in Etobicoke Centre is a little better today because somebody said something and the city finished the work. That is how this is supposed to work.
May 8 · reported
Reported this yourself? Add your after photo when you pass by. It completes the record.
18 days
report → fix
Toronto 311
confirmed by
Reported May 8 · resolved on May 26, 2026 · Confirmed complete by Toronto 311 · July 17, 2026 · checked against the city's records, not taken on faith
33, Sabrina Drive, Willowridge-Martingrove-Richview, Etobicoke Centre, Etobicoke, Toronto, Golden Horseshoe, Ontario, M9R 2K5, Canada Toronto
What's nearby
Transfiguration Of Our Lord Catholic Elementary School
School · anchors this report's story
Ecole Elementaire Felix Leclerc
School
Dixon Rd at Celestine Dr
Bus Stop
Dixon Rd at Celestine Dr
Bus Stop
Blackfriar Park
Park
The case we sent
Report details · AI-written, reviewed by the reporter
A vertical crack pattern approximately 10-15 feet long runs down the center of the driveway with multiple interconnected fractures and broken asphalt sections, creating a tripping hazard and indicating structural failure likely caused by subsurface settling or tree root displacement. The linear damage pattern and severity suggest ongoing movement beneath the surface.
What we did for you
- ✓ We heard you, and saw what you saw 2:31:32
- ✓ Made sure no faces or licence plates travel with your photo 2:31:32
- ✓ Wrote the formal report in the city's own language, for you 2:31:32
- ✓ Matched your report to Ward 2, for you 2:31:32
- ✓ Delivered it to Toronto 311, the same minute 2:31:42
- ✓ Caught the city's reference number so you never have to chase it May 8
- ✓ And when the city marked it fixed, we brought the answer back to you. That's the loop, closed. May 26
Your 15-second report became all of this before 2:32 the same afternoon.
The neighbourhood
Your ward
More from this area
Utility cut road repair site
62 Sabrina Drive, Willowridge-Martingrove-Richview, Toronto
4mo ago
Multiple potholes in residential street
73 Breadner Drive, Willowridge-Martingrove-Richview, Toronto
3mo ago
Road surface alligator cracking near curb
Sabrina Drive
3mo ago
Severe asphalt cracking on street
1 Sabrina Drive, Willowridge-Martingrove-Richview, Toronto
3mo ago
Deteriorated pedestrian crosswalk markings
1 Sabrina Drive, Willowridge-Martingrove-Richview, Toronto
3mo ago
Property Standards at Arkley Crescent
Arkley Crescent
19d ago
Discussion · 0 comments
No comments yet. Log in to be the first.