Construction obstruction on sidewalk
Silent. No response from Toronto 311 in 133 days.
Your report was delivered on Apr 16. Most reports get a response within days; this one has passed that window. This page keeps checking, and keeps count.
629 Vaughan Road, Oakwood Village, Toronto Toronto
What's nearby
D'arcy Mcgee Catholic Elementary School
School
J R Wilcox Community School
School
Vaughan Rd at Oakwood Ave
Bus Stop
Oakwood Ave at Vaughan Rd
Bus Stop
Laughlin Park
Park
The case we sent
Report details · AI-written, reviewed by the reporter
A concrete utility structure wrapped in plastic sheeting is obstructing the public sidewalk at 629 Vaughan Road, surrounded by warning signs and a metal barrier. The obstruction reduces sidewalk accessibility and creates a potential tripping hazard for pedestrians, particularly at night. The location is in a city-designated flood-prone zone with aging catch basin infrastructure nearby.
What we did for you
- ✓ We heard you, and saw what you saw 8:54:50
- ✓ Made sure no faces or licence plates travel with your photo 8:54:50
- ✓ Wrote the formal report in the city's own language, for you 8:54:50
- ✓ Matched your report to Ward 12, for you 8:54:50
- ✓ Delivered it to Toronto 311, the same minute 8:55:12
- ✓ And when the city says fixed, we check the record and bring the answer back here ongoing
Your 15-second report became all of this before 8:56 the same evening.
The neighbourhood
Seen it? Tell your neighbours · your update holds the city to its word
Sign in to report what you see on the ground.
1 neighbour confirmed since Apr 16
Discussion · 0 comments
No comments yet. Log in to be the first.