Construction Issue in Ward 14 — Toronto-Danforth
4 construction issue reported in Ward 14. 1 resolved (25.0%). Avg resolution: 5.5 days.
4
Total Reports
3
Open
1
Resolved
25.0%
Resolution Rate
Recent Reports
Concrete truck blocking street
Construction crew has been blocking off the sidewalk for weeks now without a permit and harassing...
Concrete truck blocking street
Construction crew has been blocking off the sidewalk for weeks now without a permit and harassing...
Concrete truck blocking street
Construction on restaurant blocking road and sidewalk plus blocking sidewalk with materials
Trail blocked by construction cones
Bike path is abruptly blocked with no signage and no detour or information, forcing people onto l...
Spot a construction issue in Ward 14?
Report it in 10 seconds. AI writes the report, city gets notified.
Report Now